CLECO work to close 8th Avenue in Covington near STHS campus

Newsroom

Newsroom

Search News

Search
More Filters

Thursday, July 16, 2020

News

Share this page

CLECO work to close 8th Avenue in Covington near STHS campus


CLECO is scheduled to replace a transformer at St. Tammany Health System’s main Covington campus that will require the closure of 8th Avenue to traffic from Friday night (July 17, 2020) to midday Saturday. Power to the hospital’s neighbors is not expected to be interrupted as part of the work. (Stock photo)

By STHS Communication Department

CLECO is scheduled to replace a power transformer at St. Tammany Health System’s main hospital campus this weekend, requiring the closure of 8th Avenue in Covington from 10 p.m. Friday (July 17) to noon Saturday.

Power to the hospital’s neighbors is not expected to be interrupted, according to CLECO.

The hospital will remain fully operational for the duration of the work.

The street closure is necessary so CLECO can set up equipment and run new electrical lines from 8th Avenue to the new transformer, which will be located on hospital property.

The work is being conducted to handle the increased electrical load required by the new patient tower under construction at STHS.

St. Tammany Health System is in the final months of construction on a four-story, 160,000-square-foot patient tower that will add 70 private patient rooms to the hospital. Construction is on track to be completed in December.

Featured Videos

Video

Healthy Living with Brian Grissom | March 2025

In this episode of Healthy Living, Brian Grissom, Director of Anesthesia at St. Tammany Health System Surgery Center, shares...

Thursday, Mar 27, 2025

Video

Healthy Living with Brian Grissom | March 2025

In this episode of Healthy Living, Brian Grissom, Director of Anesthesia at St. Tammany Health System Surgery Center, shares...

Thursday, Mar 27, 2025

Video

Healthy Living with Amy Wade | March 2025

In this episode of Healthy Living, we take you inside the brand-new St. Tammany Health System Surgery Center — a 126,000-square-foot,...

Monday, Mar 24, 2025

Video

Healthy Living with Amy Wade | March 2025

In this episode of Healthy Living, we take you inside the brand-new St. Tammany Health System Surgery Center — a 126,000-square-foot,...

Monday, Mar 24, 2025

Video

Community Checkup with Joan Coffman for early March 2025

Construction has been completed, inspections have been passed and the ribbon has been cut. Now, on Monday, the very first...

Tuesday, Mar 18, 2025

Video

Community Checkup with Joan Coffman for early March 2025

Construction has been completed, inspections have been passed and the ribbon has been cut. Now, on Monday, the very first...

Tuesday, Mar 18, 2025

Connect